The McBoiko's Land |
the land | the yurt | the critters | photo album | the methow |
raising the yurt #1 | raising the yurt #2 | raising the yurt #3 | floor plan | living off the grid |
We set up a tent and our coleman stove cooking unit and built a lean-to structure to cover the tools and generator. The first week we built the 30-foot platform. The beginning of the second week, we reassembled the interior walls. Check the floor plan to see a layout of the rooms. There is a small loft above the bathroom and a large loft above the closets and bedroom. Next we stretched the lattice walls around and put up the door frames and doors. The beams for the roof fit into a center ring which supports the skylight. There are two steel tension cables threaded through the beams. |
David putting the lattice frame in place. |
Susan stretching the lattice frame. |
We have a doorway! Bob finishing the lattice wall. Storm coming. |
|
|
Kat in front of the yurt. Mt McClure in the background. Storm brewing in the distance. |
Interested in knowing more about yurts? Check out the Pacific Yurts website. |
back to the top |
return to previous page |
click to continue |
|
|